Completion of repairs to the oil wharf

Repair of the oil wharf located on the south bank of the port of Radès has just been completed for a sum of 9.5 million dinars. This 9.7-metre draught structure allows tankers of 25 thousand tons and 160 meters in length to berth.

After connecting to the electricity, water and fire protection networks, the services of the Merchant Marine and Ports Office made this wharf available to the installed oil companies and for the finalization of the installation of the pipes and pumping facilities necessary for the operation of this wharf.

It should be noted that the port of Radès processes an average of 700 thousand tons of petroleum product per year.